Forms
Building Permit Application Package
Land Use Authorization Requiring CEO Approval
Flood Hazard Development Application
Maps
Land Use Ordinance
Mass Gatherings
Katie Haley
Code Enforcement Officer - Local Plumbing Inspector - E911 Addressing Officer
Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Office Hours:
Monday - Friday: 7:30 am - 4 pm
THE CEO WILL BE ON VACATION FROM JANUARY 30TH THRU FEBRUARY 3RD
Inspections and site visits are generally scheduled for afternoons.
Appointments are appreciated.
The Code Enforcement Officer is responsible for:
Other Important Information:
|
Plot Plan Information and Instructions Stair and Deck Construction Information Land Use Authorization Procedure |
Update: Plumbing permit fee's have increased!
The Town of Fryeburg currently charges the state minimum for plumbing permit fees and was recently required to increase the fees as follows:
The minimum permit fee for an internal plumbing permit is now $40.00 (up from $24.00) and the per fixture fee is $10.00 (up from $6.00).
The permit fee for a complete non-engineered waste water disposal system is now $250 (up from $100), plus a $15.00 DEP surcharge, totaling $265.00.
Attention Contractors and Homeowners : The Maine Uniform Building and Energy Code (MUBEC) became effective on December 1, 2010. This means that all construction within the State of Maine must be completed to the standards of the MUBEC. The MUBEC is comprised of the following codes, with revisions:
2009 International Building Code
2009 International Existing Building Code
2009 International Residential Code
2009 International Energy Conservation Code
2007 ASHRAE Standard 62.1 (Commercial Ventilation)
2007 ASHRAE Standard 62.2 (Residential Ventilation and Air Quality)
2007 ASHRAE Standard 90.1 (Energy Standard)
2006 Maine Model Radon Standard ASTM E1465-06
These codes can be purchased online at www.ICC.safe.org and www.ASHRAE.org .
It is expected that all construction be completed in compliance with the MUBEC, although the Town will not complete inspections of most building elements. The Maine Subsurface Wastewater Disposal Rules and Internal Plumbing Code will still be enforced through inspections.
If anyone has questions about the MUBEC and compliant construction please contact the CEO.
More information can also be obtained at the following websites:
http://www.maine.gov/dps/bbcs/
http://www.memun.org/public/MMA/svc/SFR/BuildingCode/default.htm